大学职业搜题刷题APP
下载APP
首页
课程
题库模板
Word题库模板
Excel题库模板
PDF题库模板
医考护考模板
答案在末尾模板
答案分章节末尾模板
题库创建教程
创建题库
登录
logo - 刷刷题
创建自己的小题库
搜索
【单选题】

Please Recycle That Bobsled Run(大学橇滑道) 1 For the 1992 Winter s, French organizers constructed a new motorway, parking lots and runs for skiing in the Alps. Environmentalists screamed "Disaster!’’. Thus warned, the Norwegians have adopted "green" advice and avoided great blots on the landscape. The speed-skating rink was built to look like an overturned ship, and placed so as not to disturb a bird sanctuary. Dug into a mountainside, the hockey arena is well concealed and energy efficient. The bobsled run is built out of wood not metal and hidden among trees. No wonder the president of the International Olympic Committee has called these the first "Green s". 2 Lillehammer’’s opening ceremonies featured a giant Olympic Torch burning biogas produced by rotting vegetation. During construction, builders were threatened with $7,500 fines for felling trees unnecessarily. Rare trees were carefully transplanted from hillsides. Food is being served on potato-based plates that will be fed, in turn, to pigs. Smoking has been banned outdoors as well as in, with enforcement by polite requests. 3 Environmentalists have declared partial victory, though Coca-Cola’’s plan to decorate the town with banners has been scaled back, there are still too many billboards for strict green tastes. Perhaps, but after the s, athlete housing will be converted into vacation homes or shipped to the northlands for student dormitories. Bullets will be plucked from biathlon targets and recycled to keep the lead from poisoning ground water. And these tricks won’’t be forgotten. Embarrassed by environmental protests, the I. O. C. claims that green awareness is now entrenched — along with sport and culture — as a permanent dimension of the Olympic Charter. 4 Indeed, Sydney was successful in becoming host for the 2000 Summer s in part on the strength of its endorsement from Greenpeace. Aspiring host cities are picking up the code. Salt Lake City, bidding for the 2002 s, may opt to use the bobsled run that Calgary built for the 88 s. after that, who could deny that recycling is an Olympic movement In which area did the environmentalists fail in Lillehammer

A.
Energy.
B.
Smoking.
C.
Housing.
D.
Advertising.
手机使用
分享
复制链接
新浪微博
分享QQ
微信扫一扫
微信内点击右上角“…”即可分享
反馈
收藏 - 刷刷题收藏
举报
参考答案:
举一反三

【单选题】湿滑道面上的着陆距离应:().

A.
不超过可用跑道长度的70%
B.
按干道面着陆距离的1.1倍计算
C.
按干道面着陆距离的1.2倍计算
D.
按干道面着陆距离的1.3倍计算

【单选题】盖滑道上的光电的多用是什么

A.
检测有无盖子
B.
检测盖子厂家
C.
检测生产规格
相关题目:
【单选题】湿滑道面上的着陆距离应:().
A.
不超过可用跑道长度的70%
B.
按干道面着陆距离的1.1倍计算
C.
按干道面着陆距离的1.2倍计算
D.
按干道面着陆距离的1.3倍计算
【单选题】盖滑道上的光电的多用是什么
A.
检测有无盖子
B.
检测盖子厂家
C.
检测生产规格
刷刷题-刷题-导入试题 - 刷刷题
参考解析:
AI解析
重新生成
题目纠错 0
发布
刷刷题-刷题-导入试题 - 刷刷题刷刷题-刷题-导入试题 - 刷刷题刷刷题-刷题-导入试题 - 刷刷题
刷刷题-刷题-导入试题 - 刷刷题
刷刷题-刷题-导入试题 - 刷刷题
刷刷题-单词鸭